Skip to main content

Lab Management in Visual Studio 2010 Released

In my experience, there's a lot of animosity and poor communication between Development and QA. It's not that they don't appreciate one another so much as they never seem to stay on the same page.

QA: "What's the status on defect #4874?"
Dev: "Done."
QA: "Done?"
Dev: "Yeah, I fixed that Tuesday."
QA: "Err, ok. Well where is it? I mean where can I verify it?"
Dev: "No clue. I committed it Tuesday. It passed unit tests and built successfully."
QA: "Alright. I'll track it down."

Invariably, QA speaks with the build manager (if there is one) to find the build in which that defect was repaired. After discovering the correct build, now QA needs an environment stood up to house that build. But wait, the UAT environment is currently testing the next release. It can't be disturbed for another week.

At this point, the QA person's blood pressure heads for unsafe levels and the Dice.com browsing begins. But it doesn't have to be this way...

Lab Management in Visual Studio 2010 along with TFS solves many of these pains. Here's what the above scenario might look like with Lab Management:

QA doesn't inquire to the Dev about #4874 because it's already marked Resolved and back in QA's list of Defect Work Items. It's associated with a Continuous Integration Team Build instance which is marked with a Build Quality of Ready for UAT (meaning all unit tests passed and the build compiled successfully). Behind the scenes, as part of the build, Lab Management spun up a virtual web server, application server and database server. Team Build deployed the solution to this virtual environment and even sent an email to the build manager and the QA person (they chose to be alerted) saying this environment was ready for testing. This shop is currently testing four pending releases along with a production hotfix that's going out later today--all at the same time in completely separate environments.

Best of all, it's an amazing value. If you made/make the investment in Visual Studio 2010 Ultimate, you get Lab Management for free. Yes, that's right: free. That said, you will need some not insignificant hardware to serve as a host for these virtual servers...but you have that already, right?

Comments

It seems like a very good web site but my English is not good. But, I like this web site very much.

By the way, Thanks for the this information.

Popular posts from this blog

TFS Reports Out of Date

You may have noticed it takes a while for Team Foundation Server (TFS) reports to reflect changes you've made to work items or builds. Let me guess...about an hour, right? Out of the box, TFS is set to refresh the data warehouse from its transactional store every 60 minutes. How do I change the frequency of the data warehouse refresh? Browse to the TFS Controller Web Service on your TFS application tier server within IE at: http://localhost:8080/Warehouse/v1.0/warehousecontroller.asmx Select the ChangeSetting option Enter RunIntervalSeconds for the settingId and the desired number of seconds for newValue (300 for 5 minutes...5*60) Select Invoke How do I force a data warehouse refresh? Two methods here: either via the above web service or using SQL Server Management Studio. Via the web service: Browse to the TFS Controller Web Service within IE at: http://localhost:8080/Warehouse/v1.0/warehousecontroller.asmx Select the Run option Click Invo...

Rollback a Ooops in TFS with TFPT Rollback

Rhut roe, Raggie. You just checked in a merge operation affecting 100's of files in TFS against the wrong branch. Ooops. Well, you can simply roll it back, right? Select the folder in Source Control Explorer and...hey, where's the Rollback? Rollback isn't supported in TFS natively. However, it is supported within the Power Tools leveraging the command-line TFPT.exe utility. It's fairly straightforward to revert back to a previous version--with one caveot. First, download and install the Team Foundation Power Tools 2008 on your workstation. Before proceeding, let's create a workspace dedicated to the rollback. To "true up" the workspace, the rollback operation will peform a Get Latest for every file in your current workspace. This can consume hours (and many GB) with a broad workspace mapping. To work around this, I create a temporary workspace targeted at just the area of source I need to roll back. So let's drill down on our scenario... I'm worki...

VSTS 2008 Data-Driven Web Test

During a client demo this afternoon, I mind-blanked on creating a data-driven web test. Sure enough, I stepped out of the client offices and figured it out. Super. But, I think it's counterintuitive enough to outline in a blog post (...trying to make myself feel better ;-). Somewhat in my defense, I was thinking about data-driven unit tests. These, IMO, are easy to implement. Data-driven web tests are a bit more effort and challenging. Create a web test: Right-mouse on your test project selecting Add >> Web Test. Use the browser recorder to capture your web test scenario. Let's assume you're submitting an age and credit rating to an insurance rate calculator...similar to the screen capture below: Create a table or CSV file (comma-delimited...just use Excel and save as CSV) with relevant headings for your inputs and expected values: From Solution Explorer, double-click on your web test. In the main window, right-mouse on your web test selecting Add Data Sou...